Taiyuan the 2nd heat and power plant 7 period project aircrew of 2 × 300MW invi
From;    Author:Stand originally

Taiyuan the 2nd heat and power plant 7 period project aircrew of 2 × 300MW invite public bidding of the 3rd batch of subsidiary engine equipment

One, project general situation:

Build an unit: Greatly Tang Taiyuan the 2nd heat and power plant

Project name: Big Tang Taiyuan the 2nd heat and power plant 7 period project class of 2 × 300MW is empty aircrew of cold heat addition

Project address: Industrial district of Taiyuan city north suburbs

Detailed list of equipment of invite public bidding:

Unit of content of serial number invite public bidding is counted quantity

Water of 1 dynamoelectric filter implement cover 11

Mesh of backwater of 2 hot nets covers 10

3 cooling water are automatic and reactive device covers 6

4 2 endowment mesh 21

5 glue ball 8 of filter cloth cleaning device

6 of 6 pneumatics machine

7 decrease 12 of lukewarm pressure regulator

9 of 8 tramp iron separator

17 of 9 flat filter

10 limestone pink carry systematic 2

11 remove dust equipment 32

12 housetop inform implement 16

4 of 13 cloth machine

14 dc systems

15 electrons car judge 2

2 of 16 pneumatic actuator

8 of report of 17 dynamoelectric actuator

18 steel structure call stage report 4

12 of machine of 19 magnetic separation

Financing source: Wholy-owned construction of round company of Chinese big Tang Ji, 20% what capital gold occupies a project to always invest, the others 80% by the commercial bank loan

2, the qualificatory requirement of bidder:

Bidder should have the capacity that fulfils a contract satisfactorily, specific should accord with following condition:

1. is can assume the legal person of civil liability independently

2. runs a system through ISO9000 quality attestation

3. bidder is due production crosses form a complete set of power plant of coal fired of above of stand-alone capacity 300MW to bid equipment outstanding achievement is mixed good use outstanding achievement, outstanding achievement should be bidder, is not his parent company, subsidiary, cooperate

Square or the technology supports square, bidding define in the file bid the specific outstanding achievement of equipment, characteristic of material, craft. Power plant of coal fired of above of 300MW of 4 stand-alone capacities must include in specific outstanding achievement

Form a complete set bids success of at least 2 years runs equipment unit experience.

Two when 4. legal representative is same person (reach above) bidder must not bid at the same time; Parent company, wholy-owned subsidiary and its holding company must not bid at the same time.